Updated port movement
Height of the river and local weather
Port evolution in Consortium hands
Port evolution in Consortium hands
From 2005 until now many investments have been carried out in the Port of San Pedro and prospects are encouraging for the following months if we consider the commitments, agreements and bids established on the development of this space.
In charge of the Province:
-Reconditioning of the administration building
-Reconditioning and patching of the head dock
-Buoyage of breakwater Nº 1
-Reconditioning of the administration building (Change of roof)
-Reconditioning and patching of the head dock
-Extension and refurbishment of the existent toilets
-Reconditioning of the illumination system in the port area and access streets
-Acquisition of furniture, implements, tools, machinery, computers and intangible communication equipment (Accounting System)
-Parking for light vehicles
-Operative repairs (Patching)
-Purchase of container for offices of PNA and OPIP provided with kitchen and bathroom
-Installation of 5 upright stairs in both docks
-Installation of the man overboard alarm system
-Safety signs in breakwater Nº 1 and repair/painting of mooring bitts.
-Repair of anti-stepping wire fencing in restricted area
-Heating and air-conditioning for the offices of PNA
-Sheds 1 and 2 – Repair of roofs, floors and internal painting
YEAR 2006
In charge of the Consortium:
– Operative Repairs (Patching)
– Maintenance of waterways (Dredging)
– Head Dock, overseas dock and front of the overseas dock 9000 m3 (For the same value 12000 mt3 were refuted)
– Installation of the PNA and OPIP offices
– Shed for port staff
– Purchase and laying of 4 defenses in head dock
– Painting, wire netting and repair of sheds 1 and 2
– Repair of entry gates
YEAR 2007
In charge of the Province:
-Rebuilding of pavement of breakwater Nº 1 (Bid opening – Nov 17th, 2005)
-Docks dredging, manoeuvres zone and access channel (320,000 m3)
-Provision and installation of buoys in the access channel.
–Installation of closed circuit TV
-Geotechnical study
-Complementary dredging (50,000 m3)
-Purchase of 4 defenses for the overseas dock
YEAR 2008
In charge of the Consortium:
-Repair of articulated pavement in breakwater N° 1.
-Refurbishment, extension and conditioning of the operative area office – maintenance room
-Repair of sewage piping of the operative area office
-Conditioning of external bathrooms.
-Extension of the closed circuit TV.
-Setup of access control in gate N° 1.
-Purchase of 2 defenses for the quay of breakwater N° 1.
-Construction of parking in the administrative building.
-Repair of Nelson crane, property of the Consortium.
In charge of the Consortium
-Coastal trade quay at breakwater N° 2
-Construction of a dock for the entry of container ships
-Construction of cameras’ control room
-Relocation of sanding facilities
-Construction of a room for the installation of power generating set and the corresponding control panel.
-Quality certification ISO 9001-2000 9001-2000.
In charge of the Province of Buenos AIres
-Installation of the fire protection system
-Alternative road to enter to the port, junction with Road 1001 (Project of the Provincial Road and Transport Department)
-Rebuilt of quay in breakwater Nº 1
The works carried out by the C.G.P.S.P. except for the dredging, were performed by companies and staff of the city of San Pedro.
Wi Fi Port
We have recently added the WiFi service of Internet in all the port area, for the use and comfort of ships’ crew and port’s operators that need this service in order to carry out their repective tasks.
Support to a great act of historical recovery
Photos of the sites
www.notisanpedro.blogspot.com, www.sanpedroinforma.com.ar and www.canalwebsanpedro.com.arInauguration of fruit season and ISO-certification giving ceremony
At the inauguration ceremony of fruit season 2011 there were present: the Undersecretary of Port Activities, Luis Abott; the Production Secretary (and temporary clerk of Government), Norberto Atrip and the Director of Turism, Fabián Bianchi. On behalf of the Town Council of San Pedro there were present all the members of “Consorcio de Gestión del Puerto de San Pedro”, representatives of Multimar company and of the Shipping Company “Sucesión Carlos Saliva”, port labor unions and representatives of the Argentine Coast Guard and Customs. This ceremony matches up with the announcement of four ships in less than 10 days that will carry fruit to different port destinations. Besides, the Port of San Pedro received the ISO standard certification for which it was subjected to a hard process during last months. Season 2010 marked a record. It is expected that the new season can equal or beat the previous one. This was the shared best wish of the present people.
Inauguración de la temporada de frutas y entrega de la certificación ISO
Se realizó la ceremonia de inauguración de la temporada 2011 de carga de frutas. Estuvieron presentes, el Subsecretario de Actividades Portuarias, Luis Abott, Secretario de la Producción (e interino de Gobierno) Norberto Atrip y el Director de Turismo Fabián Bianchi, en representación de la Municipalidad de San Pedro, todos los integrantes del Consorcio de Gestión del Puerto de San Pedro, representantes de la empresa Multimar y de la Agencia Marítima Sucesión Carlos Saliva, los sindicatos portuarios y representantes de Prefectura Naval Argentina y la Aduana. En la ceremonia, que coincide con el anuncio de cuatro barcos en menos de 10 días, que cargarán frutas con destino a diferentes puertos, además, el Puerto de San Pedro recibió la certificación de la Norma ISO para la que se sometió a un intenso proceso durante los últimos meses. Los mensajes de los presentes y el augurio compartido es el de una muy buena temporada que iguale o supere a la del 2010 que marcó un récord.
Meeting to draw up a plan for joint actions
The “Consorcio de Gestión del Puerto de San Pedro” called a meeting on March 31st in the Business and Industry Center. There were present representatives of many sectors related to port activity. There were present: the Customs, the Argentine Coast Guard, the San Pedro stowage company, the shipping company “Sucesión Saliva”, port labor unions, Merchant Shipping, crane operators, tally clerks, stevedores and ships night watchmen, apart from PROBYT company in its capacity as Protection Organization, recognized by the Port of San Pedro. The purpose of this meeting was to interchange opinions before the beginning of the next seasonal fruit loading campaign in the local port and also to deal with some items related to the control and prevention of drug trafficking.
The port OPR by means of his president, Commandant Oscar Correa, reported on the world situation as regards drug trafficking to the participants. He explained the estimated volumes that were dealt in during 2010 and the routes used for that scope. He went into this topic in depth and talked about the present situation and the strategies planned for the following months.
The participants were also informed that the port has doubly certified all the protection code preventive proceedings, as well as the standards ISO 9001:2008. About these proceedings in particular the Customs asked the Management Consortium for the possibility of controlling the water surface of the overseas dock, its coast and the starboard of ships moored in the cereal loading quay.
During this meeting there were present the following persons:
On behalf of Customs:
The Manager of the Customs of San Pedro, Mr. Gustavo del Río.
The Customs brokers Sergio Pujol, Walter Kissling and Sergio Graciano.
On behalf of the Argentine Coast Guard:
Commandant Norberto Posadas.
Noncommissioned Officer Adrián Rey.
On behalf of Port Labor Unions and FEPIMRRA:
Pablo Pan (For FEPIMRRA and SUPA)
Matías Franco (For Merchant Shipping)
Darío Chichizola (For Crane Operators)
José Corado (For Ships Night Watchmen)
Diego Balcaza (Tally Clerks)
On behalf of the Port Management Consortium:
Mariano Veiga (President)
Eng. Dante Ambrogi (OPIP)
Attorney María Victoria Vitale (Legal Assistant Manager)
Carlos Arrieta (Operative Assistant Manager)
On behalf of the San Pedro Stowage Company and the Shipping Company “Sucesión Saliva”
Roberto Crugnale
Fernando Naso
Evolution of tariffs and duties to the sanding facilities licensees
The “Consorcio de Gestión del Puerto de San Pedro” makes available the information about the avolution of the tariffs to the sanding facilities licensees. The information related to this topic, classified per type of tariff and per amount received during the last liquidations can be found in two charts that may also be downloaded.

























